Rail Project

ICTSI Manila Berth 7

Mlion Corporation completed the Aluminothermic Rail Welding, laying of sole plates, levelling, clips installation and grouting works required for the rail installation on ICTSI Manila Berth 7.

Project Info

A team of 11 workers completed the month-long works on site with a tight timeline due to delays prior to the start of the works by Covid-19.

Rails: Din 536/1 A120 Rails
Clips: RailLok W25
Pads: MK9 RailLok C220
HDB: M20 x 250 x 100 Fish Tail
Epoxy Grout

Related Rail Projects

Planning to
build Something?

You can reach us by using our Contact Form
or using our Project Estimator.

WATERFRONT

Flood protection and waterfront structures for berthing facilities for harbours and port projects.

UNDERGROUND

Substructure Foundation Works for Drilling,
Tunneling and Earth Retaining Structures.

RAILS

Crane Rails and Accessories for Port
and Material Handling purposes.

PROJECT SERVICES

Consultancy for design
and feasibility studies.

Sheet Piles

Hot Rolled Cold Formed
MHZ MMZ
MHU MMU
HAT MLL
FLAT WEB

STRUCTURAL SECTIONS

TIE RODS

UPSET END TIE RODS

Need to Estimate a Solution?